Commercial Flat Roof Replacement in Leavenworth, KS
Plan a low-slope replacement with moisture removal, drainage and occupied space in view. Choose the assembly and construction sequence around the building.
Replace the assembly with drainage in view
A commercial replacement needs to resolve more than an old membrane. The deck, insulation, attachment, slope and outlets determine whether the new assembly will have a sound base and a useful drainage path.
Wet material needs an answer before it is buried. Areas around rooftop equipment and roof drains often need deliberate detailing, and changes to insulation or roof height affect curbs, edges and terminations.

Tear-off and recover decisions
Recovering an existing assembly and removing it are different scopes. The existing conditions determine what is feasible.
Phasing a commercial replacement
The building needs protection throughout the work, including at each day’s closure.
Define the assembly
Establish removal, deck work, insulation, attachment and membrane with the existing building conditions.
Coordinate building operations
Set access, material staging and protection around entrances, tenants, loading areas and rooftop service equipment.
Sequence open roof areas
Weather windows, daily closure and inspection needs determine the work sequence. The contractor sets the project schedule and system terms.